Project Background
New glass wall cladding with decorative fittings for the 1st storey lift lobby to replace the existing setup
Location
HDB Centre of Building Research, Woodlands.
Glazing Solution Provided
6mm thick clear tempered glass with white spray painted backing, no hardware.
Scope of Work
- 3D drawing with 3 variations for design approval
- Dismantle and dispose off the existing setup
- Supply of White Tempered Glass
- Construct the new glass wall cladding with decorative fittings based on the approved design proposal
Time Taken
7 Days
Challenges Faced & Overcome
Client had concerns about Glass panels near to the ground level, since they would be subjected to knocks, scratched, etc. causing them to accidentally crack. We advised client to keep the existing granite to lessen this chance since they were still in good condition.
Initial proposed design had alternating mirror and glass panels. However, upon preference of client we implemented a full glass only solution without any additional cost to them.