Project Background

Urgent replacement of broken Canopy/Awning Glass panel at a local condominium

Location

Centro Residences, Ang Mo Kio.

Glazing Solution Provided

Removal of broken glass, followed by fabrication new Glass – 13.52 mm thick low E tempered laminated glass consisting of 6 mm Low-E tempered glass + 1.52 mm clear PVB+ 6 mm clear tempered glass, as per measurement.

Installation after erecting scaffolding.

Scaffolding and installation

Scope of Work

  • Erect scaffolding and remove after replacement
  • Provision of $ 2 million public liability and workmen compensation insurance
  • Supply tools, labour and material to remove existing broken glass
  • Supply and installation of new Glass Panel

Time Taken

2 days – 6 hours each day

Challenges Faced & Overcome

Tenant is overseas, needed more time to arrange. Job was subjected to rain conditions. Delayed payment from insurance of the MCST, more time spent on glass fabrication.